Earth Pit
Heavy duty earth inspection Housing is designed to carry a load of more than 3,000 kilograms because the wall is of Reinforced concrete, which is suitable for most industrial and commercial applications. It is also built into the Earth pit, earth busbar along with proper insulators to install the ground bar.
The construction of the Earth Pit has the following advantages:
1. It has a hole (concrete chamber) and a secure door as well as a strong handle which is opened by the technical responsible personnel when is necessary and enters the hole, it also is protected from contamination when the door is closed.
2. It also has the secure solid bolts which is used for disconnecting link between earthed equipment with real ground when it is necessary to perform some tests and measurements, which is similar to those cases such as Pigtail and cad weld that doesn’t have possibility of disconnecting in the necessary conditions, therefore it is a beneficial advantage.
Click here for downloading the catalogue.